What the survey covers
Battery sites run hot by design, so the useful signal is a unit running hotter than identical units around it under the same load. We compare like with like across the yard.
- Enclosure HVAC and cooling faults, shown as enclosures running above their peers
- Hot terminals, cable connections and inverter cabinets
- Transformer and switchgear hot spots visible from outside
- Seal, door and housing damage, and debris or vegetation near equipment
- Site conditions: drainage, fencing and access routes
How we fly it
- Site orientation. We follow your site safety rules and access procedures and keep a fixed standoff from energized equipment.
- Capture under load. Thermal and RGB imagery during a discharge window agreed with your operations team.
- Compare and review. Each enclosure, inverter and transformer is compared with its peers; an analyst confirms every flag.
- Deliver. A signed report, a findings register keyed to your asset IDs and entries formatted for your maintenance logbook.
Built for your maintenance records
California's battery-storage maintenance standards (CPUC General Order 167-C) expect operators to keep maintenance and inspection records for their facilities. Our findings register and logbook entries are formatted so they can be filed directly with those records. Your compliance obligations remain yours; we supply documented inspection evidence.
What you receive
- Signed report (PDF): summary, findings, severity, recommended actions and sign-off
- Findings register (CSV, XLSX): every finding with coordinates, asset IDs, severity and status
- GIS layers (GeoJSON, KML) and georeferenced orthomosaics (GeoTIFF)
- Image pairs: a thermal and a visual image for each finding
- Capture log: flight times, irradiance and weather, for the record
Questions
Do you need to enter the yard?
Usually not. The survey is flown from outside the energized area at a fixed standoff, following your site rules. Any ground access is arranged with your site team.
Can you fly during a heat event?
We schedule in a planned discharge window before summer peaks, when differences between units are easiest to see and safest to act on.