Service area · Los Angeles County

Defensible-space readiness in Malibu and the Santa Monica Mountains

All of Malibu is a Very High Fire Hazard Severity Zone. Every home sold there needs a defensible-space inspection, and LA County Fire inspects every year.

100%Of Malibu in a Very High zone
AB 38Applies to every sale
LA County FireInspecting agency
Early JuneAnnual inspections typically start

What applies in Malibu

The City of Malibu notes that all of Malibu is designated a Very High Fire Hazard Severity Zone, so every property sold in the city is subject to AB 38's defensible-space inspection requirement. LA County Fire, not the city, performs those inspections, and its engine companies run annual brush clearance inspections starting in early June.

The Zone 0 rules adopted in 2026 add a five-foot ember-resistant zone around homes. Some items, such as clearing roofs and gutters and keeping firewood out of Zone 0, apply right away. See our plain-English Zone 0 guide.

What we provide

  • Owner readiness reports: zone map, numbered fix list, photos and a 16-item checklist
  • Pre-listing reports for sellers and listing agents, so the AB 38 inspection goes smoothly
  • HOA and canyon-community programs with a board summary and a recheck flight
  • Before-and-after records of completed work, useful for insurance conversations

Steep lots and canyon terrain

Slopes, canyons and dense native vegetation make walking every boundary slow and sometimes unsafe. An aerial survey maps the full 100 feet around each structure, clipped to the property line, in one flight.

Questions

Can your report be used for the AB 38 sale requirement?

No. Only LA County Fire can perform the AB 38 inspection. Our report helps sellers fix issues before it.

Sources

  1. City of Malibu: AB 38 defensible space inspections
  2. City of Malibu: AB 3074 (Zone 0)
  3. Patch: Malibu brush clearance inspections begin June 1

Get a fixed-scope proposal

Tell us about the site, community or portfolio. We reply within one business day.

Request a proposal